home about us history projects contact

Projects

Name of CustomerContract #Brief Description of WorkTotal Contract ValuePrimary ContactDate
Fluor Hanford, Inc.
100KX Pump and Treat
Contract No.
14366,
Release No. 127
Complete Pump and Treat System. Installation of Electrical Utility Power, facility lighting, concrete flooring equipment pads, and fab of all electrical stanchions for 11 Extraction wells and 9 Injection wells and the installation of assoc. well piping. Work includes: well head tie-ins, concrete pads, bollards work, piping supports, tank installation, concrete and cast in place concrete, excavation, backfilling and compacting, special protective coatings, joint sealing, metal fabrications, expansion anchors, electrical service and dist. and instruments, fusion welding of high density polyethylene$4,130,816.00John Phillips
PO Box 1050
Richland, WA 99352
509-376-8435
02-08
01-09
CH2M Hill Hanford Group, Inc.
Integrated Disposal Facility (IDF) Care and Custody Services
Hanford Site
Contract No.
30999,
Release No. 01
Provide Care & Custody activities at the IDF Facility that consisted of but not limited to: perform dust control functions; perform pumping of the facility sumps; perform routine inspections & surveillances; perform corrective actions as req'd; perform Lockout/Tagout functions; provide written surveillance reports, inspection reports & records for all activities performed$222,874.99Rob Sheehy
CH2M HILL
509-373-3425
02-07
09-08
Pasco High School Modernization & Addition, Phase 1 Pasco, WAProject No. 0610 0610 This project consisted of: modernizing the existing (approx) 38,000sf gymnasium/activity center; construct a new (approx) 25,000sf two story addition incl. new cafeteria/food court & kitchen; site improvements to incl. demo, utility extensions, grading, paving, curb, gutter & sidewalks.$9,398,578.00Jerry Marsh Pasco School District 509-727-68055-07 8-08
Fluor Hanford, Inc. S-209, PTA Administration BuildingContract No. 30440, Release No. 001Construct a new administration building (approx. 7,500sf). Bldg consists of offices, men's and women's restrooms/locker rooms, a janitor's room, utility rooms, a lunchroom and classrooms. Extend water, sewer and electrical utilities to the new bldg. Provide landscaping, including underground sprinklers and walkways. Provide concreted handicap parking area. Provide design for the bldg foundation, flag pole foundation, building structure including roof, fire alarm system, fire protection system and irrigation sprinkler system.$1,379,263.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843511-06 05-08
Fluor Hanford, Inc. S-202, Armorer BuildingContract No. 30440, Release No. 002Construct a new administration building (approx. 4,500sf). Bldg consists of offices, men's and women's restrooms, a janitor's room, utility rooms, a lunchroom and shop. Extend water, sewer and electrical utilities to the new bldg. Provide landscaping, including underground sprinklers and walkways. Provide concreted handicap parking area. Provide design for the bldg foundation, flag pole foundation, building structure including roof, fire alarm system, fire protection system and irrigation sprinkler system.$775,294.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843511-06 05-08
Ben Franklin Transit Richland, WAProject No. 20703.02This project was procuring & installing a new bus wash bldg of approx. 3,300sf; converting existing bus wash to storage use; provide struct. steel framing & metal siding at an existing canopy$1,058,249.06Rob Orvis Ben Franklin Transit 509-734-512510-07 4-08
Battelle Project No. S537020This project will provide a two-story building addition and remodel the SW side of the existing EMSL building. The project shall consist of approx. 15,106sqft of new office space and approx. 582sqft of new circulation space. $2,931,416.64Mark Hartzell Battelle 509-376-46802-07 08-08
Sigma/Battelle Renovations NSB Building: Main Floor Richland, WAProject No. 0611The work involves renovation of first floor space, incl. but not limited to, stair modifications, room reconfigurations, finishes, window treatment, doors/hardware, mechanical & electrical construction.$2,530,000.00Steve Hindley ALSC Architects 509-838-856812-06 10-07
Lourdes Counseling Center Adult Unit Expansion & Renovation Richland, WAProject No. 200574-00Work of the project included an addition to and renovation of the adult impatient wing of the Lourdes Counseling Center. 5,000sqft addition included 8 new patient rooms, day room and court yard/garden. Renovation consisted of upgrades to the existing patient rooms and nurses station.$1,303,000.00 Paul Scott Our Lady of Lourdes 509-546-23948-06 7-07
Adaptive Reuse of the Juniper Street Building Kennewick, WAContract No. PO521-05This project is for extensive interior remodeling to the existing administration and open bay areas of the Juniper Street Building. The work includes restrooms and locker rooms; addition of a new mezzanine; site work including concrete, structural fill, curbing, fencing, asphalt and landscaping; a 2500# elevator serving two floors; extensive mechanical systems including a new chiller, fan coils, electrical power and lighting; minor roof work; systems to service shop equipment; bridge cranes; low voltage systems, pre-manufactured metal stairs; concrete and masonry work; and light and heavy gauge steel work.$3,056,443.00Steve Mallory ALSC Architects 509-735-42263-06 11-06
Fluor Federal Services Hanford SiteContract No. 27963-001L-573 Footprint Reduction & Consolidation: 27,000sf metal building to be used as a carpenter shop. Includes locker room, woodworking area, storage and office space.$2,900,000.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843511-05 present
Tri-City Cancer Center Wellness Center Kennewick, WAPO # 019021Wellness Center: Interior remodel of unfinished space at the TC Cancer Center. 4200 sf of kitchen space, conference room and bathrooms.$309,000.00Laurel McKeehan Tri-Cities Cancer Center 509-737-34211-06 11-06
CH2MHILL Hanford Group, Inc. W-540 Breathing Air Facility, Richland, WA 99352Contract No. 22319 Release 08The Breathing Air Facility Project has been established to provide a facility which will house two breathing air compressors, fill stations and reserve compressed air storage that will be operated by the Hanford Fire Department to support all breathing air bottle filling needs of the Tank Farm Contractor.$305,200.00Chad Wheeler CH2MHILL 509-373-528810-05 02-06
Banner Bank - Pasco Branch Pasco, WAProject No. 04023Site work and construction of a 3020 sf wood framed building. Masonry veneer, metal roofing, mechanical and electrical systems$616,000.00Brian Piippo Loofburrow Architects 509-457-5121 06-05 11-05
CH2MHILL Hanford Group, Inc. W-540 Breathing Air Facility, Richland, WA 99352Contract No. 22319 Release 08The Breathing Air Facility Project has been established to provide a facility which will house two breathing air compressors, fill stations and reserve compressed air storage that will be operated by the Hanford Fire Department to support all breathing air bottle filling needs of the Tank Farm Contractor.$305,200.00Chad Wheeler CH2MHILL 509-373-528810-05 02-06
Banner Bank - Pasco Branch Pasco, WAProject No. 04023Site work and construction of a 3020 sf wood framed building. Masonry veneer, metal roofing, mechanical and electrical systems$616,000.00Brian Piippo Loofburrow Architects 509-457-5121 06-05 11-05
Benton City Library Benton City , WA Project No. 0516Site work and construction of a 4671 sf slab-on grade, wood framed building. Masonry wainscot, asphalt shingle roofing, mechanical and electrical systems$670,000.00Steve Mallory ALSC Architects 509-735-4226 07-05 12-05
Yakima Co. Public Services Terrace Heights Transfer Station Yakima, WA 98901Project No. SP 3116Site development for a garbage transfer facility. 26,300 sf pre-engineered metal transfer building, 300 sf metal framed support building, scale facility expansion, 3200 sf single story wood framed administration building, expansion for recycle area. $5,100,000.00Rae Early Project Manager 509-574-2319 07-05 02-06
Bechtel National Inc. Waste Treatment Plant Fireproofing Temporary BuildingsContract No. 24590-NP-HC1-UA11-00002Site grading, foundations and erection of two owner-furnished pre-engineered metal buildings, 70 ft. x 320 ft. Includes fire protection, fire alarm, power, and lighting.$1,532,000.00Cindy Ricci Subcontract Admin. 509-373-840501-05 06-05
Fluor Hanford Project L-376B Rigging Facility Modifications and Addition Contract No. 14366Modification of the existing office / change room and addition of 3700 sf of office / lunchroom space including design of the foundation and the metal building. Includes expansion of the existing equipment storage yard and new parking for 60 vehicles$1,012,000.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843502-05 09-05
CH2MHill Hanford Group, Inc. Demonstration Bulk Vitrification System - Site Preparation Project Contract No. 22319 Release 04Site preparation for the Demonstration Bulk Vitrification System, consisting of clear & grub, site grading, eighteen (18) concrete foundations totaling 35,231 sq. ft.(2100 cy), electrical grounding, duct banks, and power line relocation.$1,342,000.00Gary Kelmel Project Engineer 509-438-9065 09-04 02-05
Framatome ANP, Inc. BLEU Bundle Storage Addition ANP, Inc. BLEU Bundle Storage Addition Agreement No. 5500000314An 1300 sf expansion of the existing fuel fabricating facility for finished product storage. The expansion includes demolition, earthwork, concrete foundations, masonry walls, structural steel, roofing, storage racks, HVAC, and electrical.$283,500.00Paul Wees Project Manager 509-375-8304 06-04 09-04
City of RichlandSR-240 Beautification Wall. Site grading, concrete foundations, pre-cast concrete panels, slope protection, and hydro seeding for 4,302 linear feet of sound / beautification wall along the by-pass highway between VanGiesen Street and Swift Blvd.$575,000.00Steve Stairs Project Engineer City of Richland 509-942-7500 12-03 09-04
Kennewick High School New GymnasiumThis project involves the construction of a new stand alone gymnasium, consisting of 25,789 sf on the ground floor, and 4,556sf on the Mezzanine level. The structure is composed of structural steel, concrete masonry, and metal building system components. With the latest state of the arts facilities to meet the most current codes.$3,431,300.00Brian Johnston CKJT Architects 128 Vista Way Kennewick WA 99336 509-783-544401-04 11-04
Yakima County Restitution CenterYakima County Project No. N2-125-CSGenerally the work includes, but is not limited to: Selective site and existing building demolition. Includes contaminated hazardous soils and building materials abatement. Excavation work for footings, foundations, and underground utilities, placement of structural fill, underground utilities,etc... Re-erection of a pre-engineered steel building framing, new roof structural framing and roofing, concrete tilt-up insulated core exterior walls, for a finished space of approximately 100,000 sf. Complete build-out of building interior including new security measures, master control security control room, medical facilities, and laundry facilities. $11,168,802.00Jacob A. Jundt Project Manager 217 N. 1st Street Yakima, WA 98901 509-574-171106-03 11-04
Framatome ANP, Inc. BLEU Pelletizing Facility Agreement No. 5500000277An 8000 sf expansion of the existing fuel fabricating facility for the BLEU Pelletizing Facility. The expansion includes demolition, earthwork, concrete foundations, pre-cast walls (by owner), masonry, structural steel, roofing, piping, HVAC, and electrical.$1,213,720.00Gary Fring Project Manager 509-375-856011-03 04-04
Battelle 300 Area Hanford SiteContract # 7559331 Bldg. Wet Chemistry and Biological Lab Modifications. 300 Area, Hanford Site Provide the necessary architectural, exhaust ventilation, service piping, and electrical infrastructure required to modify 19 existing labs.$962,423.00Kim Anderson PO Box 999 Richland, WA 99352 509-376-5281 06-03 12-03
Smart Park LLC2435 Stevens CenterNew 4 Story Office Building consisting of 90,000 sf steel frame, brick and stucco exterior. Constructed on a fast track schedule.$7,300,000.00George Garlick 2400 Stevens Richland, WA 99352 509-375-600304-02 10-02 ot os
Smart Park LLCSmart Park LLC WTP Training CenterNew 2 Story Training Center consisting of 78,000 sf steel and wood frame, brick and stucco exterior, for the WTP-VIT employee training center. Constructed on a fast track schedule.$5,520,000.00George Garlick 2400 Stevens Richland, WA 99352 509-375-600305-02 10-02 ot os
Fluor Federal Services Hanford SiteK50121EMSL Emergency Generator Room Addition construction of a exterior wing including canopy patio for a secondary emergency generating plant for the super computer lab. Addition was made of steel and brick to match existing. All necessary electrical and mechanical appurtenances were furnished and installed as well.$259,081.56Kim Anderson PO Box 999 Richland, WA 99352 509-376-528105-02 08-02 ot os
Bechtel National, Inc.24590-CM-HC1-UA11-0001Five Temporary Buildings - Pre-Engineered Metal Buildings Provide all necessary materials, furnish services, all required labor, tools, equipment, supervision and all incidentals necessary to design, furnish and construct five pre-engineered metal buildings which will be used to provide temporary construction facilities for the Waste Treatment Plant, located in the 200 Area of the Hanford Site.$10,785,000.00Eric Drew Bechtel National Inc. Hanford Site 509-373-841512-01 08-02 02-01 09-02
Kennewick Public Hospital DistrictPhase V Remodel - Remodel of the Pediatrics Wing Complete interior remodel of the wing including all architectural, mechanical and electrical. Including a small exterior addition consisting of steel and stucco construction. $956,059.00Ted Luvaas, Dillman-Luvass Ass. 660 Symons St. Richland, WA 99336 509-946-418911-01 08-02 ot os
Bechtel National, Inc.24590-CM-HC3-CG00-0001Site Preparation- Perform all work as detailed in Exhibit D which includes but not limited too: all Engineering, Procurement, Construction, and other work necessary to develop the site for the River Protection Project Waste Treatment Plant. The major civil activities include Clearing and Grubbing, Excavation, Grading, Shoring, and Backfill, Design and Installation of Earth Retention Systems, Installation of Concrete Mud Mats, Installation of the Storm Drain System, and Installation of Roads, Parking Lots and Material Lay down Areas.$4,256,214.00Ryan McKee Site Project Mgr. Bechtel National Inc. 509-371-494709-01 04-02 10-01 08-04
City of RichlandLandfill Equipment Service Building Phase I Furnish and Install a 5000 sf pre-engineered metal building for equipment maintenance facilities at the landfill$289,400.00Brian Johnston CKJT Architects 128 Vista Way Kennewick, WA 99336 509-783-544410-01 04-02 ot os
Fluor Federal ServicesJob Order 21Modular Office Installation: Set-up of a double wide modular office unit. Transportation of two units approximately two miles, blocking, leveling and anchoring of the units, electrical service connections and installation of stairs and skirting.$29,200.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843509-01 10-01 ot os
Fluor Federal ServicesJob Order 20436 Building Roof Repair: Prepare and re-seal the existing roof surface of the 436 Building located in the 400 Area. $12,400.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843508-01 09-01 ot os
Fluor Federal ServicesJob Order 19100K Install Jib Crane$10,800.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843509-01 09-01 ot os
Fluor Federal ServicesJob Order 18Hammer Training Fac - Fence & Gutters - Waste Tank property fence and TSB Gutters and snow guards$20,000.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843507-01 08-01 ot os
Fluor Federal ServicesJob Order 172721-E Shower Replacement$10,000.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843509-01 09-01 ot os
Franklin PUD8188Peak Generating Project: Site work, underground piping, foundations and CMU buildings for 4 unit Peak Power Generating Facility$1,850,000.00Joe Etheridge-IDC 2020 SW Fourth Ave. Portland, OR 97201 503-224-604008-01 01-02 ot os
Port of PascoBPA Line Room Remodel$94,900.00Brian Johnston CKJT Architects 128 Vista Way Kennewick, WA 99336 509-783-544406-01 09-01 ot os
Fluor Federal ServicesClose Pack Rail No. 4 and No. 5: Concrete Foundations (5000 cy) for entombment of US Naval Submarine Reactors$1,579,241.00Kim Anderson PO Box 999 Richland, WA 99352 509-376-528106-01 10-01 ot os
Port of BentonReplacement of south approach to the Yakima River Railroad Bridge$327,000.00John Haakenson 3100 G W Way Richland, WA 99352 509-375-306003-01 03-01 ot os
Fluor Federal ServicesK50058W-314 - Berm for Waste Transfer System Piping -3200 lf of earth berm for Waste Transfer Piping.$433,751.00Kim Anderson PO Box 999 Richland, WA 99352 509-376-5281 01-01 09-01 ot os
Eastern Washington State UniversityAE-97-11GRozell Heating Plant Improvements Furnish and Install (1) 96 million BTU Boiler Package, upgrade existing plant facilities from pneumatic to electronic controlled, and furnish and install the new A&E offices (approx. 20,000 sf)$5,614,113.00Steve Bloom 526 5th Street Cheney, WA 99004 509-359-6323 06-00 08-00 01-02 06-02
Kaiser Aluminum Corporation1167 BldgExtrusion Capacity Expansion - Design & Construct a Manufacturing Facility. Pre-engineered metal building and foundations for 4000 & 3200 ton extrusion presses.$804,820.00Bob Agostinelli Kaiser Aluminum PO Box 15108 Spokane, WA 99215 509-927-641612-00 10-01 ot os
Fluor Federal ServicesJob Order 16PWR-2 Fuel Removal Road Upgrades: Reconstruction of a 12' wide gravel surfaced roadway and the asphalt paving for an extension of an existing roadway.$12,045.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843511-00 12-00 ot os
Fluor Federal ServicesJob Order 152719 EA and MO-384 Renovations: Renovations of 2719EA Building and the MO-384 mobile offices.$73,560.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843511-00 01-01 ot os
Fluor Federal ServicesJob Order 14Dock walls and Roof, 222-S Bldg.: Installation of the concrete block wall and roof extension for the gas bottle storage dock.$9,761.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843511-00 02-01 ot os
Corp of EngineersDACW68-00-C-0050Mill Creek Diversion & Structure Modifications - Concrete and control gates for diversion structure upgrade.$303,110.00Duane West Army COE Walla Walla Dist. 509-522-642709-00 12-00 ot os
Fluor Federal ServicesJob Order 13100K Road Resurfacing and Walkways:$148,876.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843510-00 11-00 ot os
Fluor Federal ServicesJob Order 12Road Overlay, Reconstruction & Striping - Approx. 850 fee of overlay on Route 4S, the Route 4 South reconstruction, Route 1 resurfacing and K Ave resurfacing.$412,666.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843509-00 11-00 ot os
Fluor Federal ServicesJob Order 11Hammer Grading - Clear, grub, level, and gravel areas 100' x 150', 150' x 300' and 20' x 450'. And remove 24' of chain link fence and replace with a 24' wide double gate. Gravel Parking Area$38,200.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843508-00 09-00 ot os
Fluor Federal ServicesJob Order 10325 Building Re-Roof and Entryway canopies roof replacement$209,083.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843505-01 06-01 ot os
Fluor Federal ServicesJob Order 8 & 9Rattlesnake Barricade Access Road Phase I & II: Pavement overlay and new security check station for Hanford Reservation.$515,890.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843504-00 08-00 ot os
Kennewick General HospitalSpaulding 2nd Floor RemodelRemodel of numerous Doctors' Suites.$276,480.00Ted Luvaas, Dillman-Luvass Ass. 660 Symons St. Richland, WA 99336 509-946-418906-98 01-99 ot os
GESA Credit UnionKennewickKennewick Addition: 8,000 SF addition to existing wood frame, brick veneer structure.$1,106,200.00Brian Johnston CKJT Architects 128 Vista Way Kennewick, WA 99336 509-783-544403-00 01-01 ot os
Fluor Federal ServicesMisc. Job OrdersMisc Construction at the Hanford Site. Remodels, Road Re-Surfacing, Re-Roofing.$348,000.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843502-00 05-00 ot os
Fluor Federal ServicesTO. 6TO. 6Trench 94, Excavate and backfill of 100,000 cy of select fill for entombment of US Navy Nuclear Reactors at Hanford Nuclear Reservation.$348,000.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843508-99 05-00 ot os
Fluor Federal Services180301-3-K50022Target Tri-cities Industrial Building, 100,000 sf pre-engineered steel building shell, with 8' masonry wainscoted and site improvements.$2,113,000.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843509-00 07-01 ot os
Fluor Federal ServicesW-379Misc. Construction SNF - Canister Storage Building, Furnish & install NQA-1 structural steel rolling security gates, set in place 6 - 28" dia x 42' canister storage tubes, seal weld enbed flanges for 220 canister storage tubes, etc.. for Hanford Site.$1,400,000.00John Kolberg PO Box 1050 Richland, WA 99352 509-373257601-99 06-00 01-99 07-00
Fluor Federal ServicesFDNW-5541Cold Vacuum Drying Facility, Approx 25,000 sf of pre-cast - NQA-1 structure with 3,000 sf pre engineered metal building for operations for Hanford. $23,000,000.00 Paul Beaudet PO Box 1050 Richland, WA 99352 509-372-223001-96 08-96 07-96 07-00
Kennewick School District No. 17Radio/TVTri-Tech Skills Cntr - Radio & TV Improvements, 1,500 sf remodel project for Vocational school.$94,000.00Brian Johnston CKJT Architects 128 Vista Way Kennewick, WA 99336 509-783-544408-99 10-99 ot os
Siemens Power CorporationNo. 7Building No. 7 Addition, 3,500 sf single story CMU & steel joist office addition for Siemens Power Corp$279,000.00Carl Ward 2101 Horn Rapids Rd. Richland, WA 99352 509-375-848710-99 03-00 ot os
Siemens Power Corporation5500000103Ammonia Recovery Facility Addition, 1,800 sf structural steel with metal siding industrial tank storage building.$116,000.00Carl Ward 2101 Horn Rapids Rd. Richland, WA 99352 509-375-848709-99 02-00 ot os
Morgan & SonsYakima Training CntrRoad Upgrade Mitigation, Phase IV, 4 concrete CIP river bed crossings at the Yakima Army Training Center.$81,223.00Jim Renick Army COE PO Box 10 Selah, WA 98942 509-577-335608-99 10-99 ot os
City of Richland / Condon BrothersConcreteRailroad Spur - Concrete Work, 12 x 60 concrete rail loading dock for the City of Richland, WA.$58,000.00Dave Landreth 2526 Hayford Rd. Spokane, WA 99224 509-244-651107-99 09-99 ot os
Sigma Management9737EESB Basement Modifications, 4,000 sf - Basement remodel for offices requiring High Security Clearance Rating.$331,600.00Patrick Roberts 100 N Fruitland St. Kennewick, WA 99336 509-586-339503-99 06-99 ot os
Western State EquipmentCATThe CAT Rental Store - 5,700 sf - Block, steel joists, retail rental and maintenance building for Caterpillar Industries. $647,700.00Jim Holland 1620 James St. Pasco, WA 99301 509-547-954109-98 03-99 ot os
California Institute of TechnologyPC277583LIGO Hanford Staging Building - 5,720 sf pre-engineered - 2 story structure maintenance facility for CIT & MIT Institute at Hanford, WA.$736,660.00Otto Matherny PO Box 1970 S9-02 Richland, WA 99352 509-372-811811-98 07-99 ot os
Bechtel Hanford/Delhur IndustriesERDFHanford ERDF Cells 3 & 4 - 2 - 30x30 Pre-engineered metal buildings for pump house and pipe terminations, 15,000 sf off loading slab.$342,146.00John M Doyle PO Box 1116 Port Angeles. WA 99336 360-457-113307-99 09-99 ot os
Oregon Potato CompanyRe-Roof of Building - Approx 32,000 sf of demo and re-roof existing structure (roofing & purlins) of standing seam metal roofing.$562,000.00Greg Turpin 8697 Gage Kennewick, WA 99336 509-735-158908-98 12-98 ot os
Tri-Cities Cancer CenterWomen's Initiative - 5,000 sf tenant improvements (remodel) to existing building - metal studs & drywall.$217,231.00Robyn Blatter 7350 Deschutes Ave Kennewick, WA 99336 509-737-340506-98 10-98 ot os
Fluor Daniel Northwest, Inc.W-518ISA Concrete Storage Pads - 3 each CIP concrete slabs on grade (approx 10,000 sf) for interim storage of fuel rod canisters at Hanford, WA.$230,332.00John Phillips PO Box 1050 Richland, WA 99352 509-376-843503-99 07-99 ot os
Richland School District No. 400WileyNew Elementary School Building - Wiley Elementary - 48,000 sf wood frame, brick veneer, elementary school for Richland School District.$5,715,500.00Don Hammelman 2100 124th Ave. Bellevue, WA 98005 425-869-083207-98 09-99 ot os
Tri-Cities PrepConstruction of New TC Prep High School - 20,000 sf Pre-engineered metal building (gymnasium) and 5,000 sf stud steel, brick veneer, wood frame classroom addition.$869,277.00Don Mazur 9612 St Thomas Dr. Pasco, WA 99301 509-375-421009-98 03-99 ot os
Tri-Cities Cancer CenterOncology Addition - 20,000 sf stud steel, metal stud, brick veneer building, approx 10,000 sf was unfinished per design.$1,782,000.00Robyn Blatter 7350 Deschutes Ave. Kennewick, WA 99336 509-737-340508-97 08-98 ot os